Q50–Q2000
Industrial systems begin with the site conditions.
A family of electronic water treatment configurations for industrial pipework. Model and installation selection require an engineering review.
Confirm the model, pipe measurement basis and installation conditions before selection.
Request a quoteKnow the conditions.
Match the model specifications to the actual pipework. Confirm measurement basis, power supply and access before installation.
| Documented family pipe-size range | 50–2000 mm · diameter basis to confirm |
|---|---|
| Industrial-page input voltage | 87–240 V AC |
| Industrial-page supply frequency | 47–63 Hz |
| Configuration | Engineering assessment required |
Fit the system, not just the pipe.
- 01
Provide pipe diameter and measurement basis, material, flow and temperature.
- 02
Review pipe topology, electrical loops, installation clearance and power.
- 03
Agree on a baseline and a monitoring period before evaluating results.
A clear scope of treatment.
This is a product family, not a single model. Child models and ratings are not yet verified.
Existing process controls remain subject to site-specific assessment.
Prepare for an informed decision.
Model-specific technical information
For installation planning, identify the model, pipe dimensions and site requirements. Consult the applicable manual and confirm the configuration before ordering.
Q50–Q2000: practical questions
Pipe dimensions, installation and operation: answers for this product.
Explore treatment principlesIs Q50–Q2000 one model with one rating?
It identifies a product family. The documented 50–2000 mm range does not establish each model's diameter basis, dimensions or electrical rating. Selection requires confirmation of the specific model and its applicable documentation before ordering.
Can one unit cover every branch of a plant?
Coverage cannot be established from the main-pipe diameter alone. Provide a layout showing loops, branches, heat exchangers and installation points. Review electrical loops, hydraulic conditions and the treatment objective for each circuit before deciding how many units and locations are needed.
How should an industrial trial be designed?
Choose representative equipment and document its condition before installation. Agree on inspection points, cleaning records, pressure drop and heat-transfer indicators. Compare similar loads and temperatures, while logging chemical dosing, shutdowns and maintenance, so any conclusion has a traceable operating context.
What must be confirmed before procurement?
Confirm the exact model, pipe measurement basis, supply voltage, installation environment and access. Request the applicable installation instructions and agree on commissioning, acceptance criteria and written warranty terms for the ordered configuration. Do not apply one model's rating to the whole family.
A specification is only the starting point.
A useful configuration connects product ratings to the actual operating environment.
| Assessment area | Site information | Engineering decision |
|---|---|---|
| Pipework & connectivity | Outside / nominal diameter, material, branches and closed electrical loops | Model fit, clearance and signal conditions |
| Hydraulic conditions | Flow, circulation path, pump position and available pressure | Installation location and filtration configuration |
| Water & process | Hardness, suspended solids, temperature and existing treatment | Treatment roles and processes to retain |
| Operation & maintenance | Load profile, cleaning history, inspection and discharge access | Comparable baseline and practical service access |
Electronic scale control, particle separation and water-quality compliance are separate responsibilities. A site may need several coordinated processes. Neither scale control nor filtration universally replaces softening, membrane treatment, disinfection or chemical management.
Related applications
Tell us about your water system.
Pipework, operating conditions and your objectives. Let’s start there.