Pools & spas

QEQI Q49

A considered addition to pool circulation.

Electronic treatment for suitable pool, spa and pond systems, evaluated alongside the existing circulation and filtration equipment.

Maximum pipe outside diameter63 mm OD
Typical power1.2 W

Confirm the model, pipe measurement basis and installation conditions before selection.

Request a quote
01 / SPECIFICATIONS

Know the conditions.

Match the model specifications to the actual pipework. Confirm measurement basis, power supply and access before installation.

Maximum pipe outside diameter63 mm OD
Typical power1.2 W
Dimensions152 × 118 × 45 mm
Weight300 g
02 / INSTALLATION

Fit the system, not just the pipe.

  1. 01

    The supplied manual describes installation upstream of the pump.

  2. 02

    Review circulation time, turbulence and filtration with the technical team.

  3. 03

    Check metal pipework for signal-affecting closed electrical loops.

03 / OPERATING BOUNDARIES

A clear scope of treatment.

Maintain required disinfection, residual chlorine, pH control and water testing.

The device is not a filter or a disinfectant. No pool-volume rating has been confirmed.

04 / TECHNICAL DOCUMENTS

Prepare for an informed decision.

Model-specific technical information

For installation planning, identify the model, pipe dimensions and site requirements. Consult the applicable manual and confirm the configuration before ordering.

05 / PRODUCT FAQ

QEQI Q49: practical questions

Pipe dimensions, installation and operation: answers for this product.

Explore treatment principles
Can Q49 be selected by pool volume alone?

Pool volume is useful context, but it does not describe circulation conditions. Q49 has a documented maximum pipe outside diameter of 63 mm. Review actual pipe dimensions, pump flow, circulation schedule and filter configuration together; the available information does not establish a universal pool-volume rating.

How is the installation point chosen?

The supplied manual describes installation upstream of the pump. Confirm this against the actual circulation layout, clearance and electrical supply. Include the pump, filter, bypasses and return lines in the review rather than choosing an isolated straight pipe without considering the system.

Can Q49 replace chlorine or the pool filter?

Continue filtration, disinfection, pH control and routine testing. Q49 is evaluated alongside these processes. A clearer appearance is not evidence of microbiological safety, and changes to dosing or filtration should follow the pool's operating requirements and measured water quality.

What should pool operators record during evaluation?

Keep records of circulation time, filter cleaning or backwashing, water clarity, pH and disinfectant readings. Log bather load, weather and dosing changes as well. Comparing these records with a pre-installation baseline helps separate treatment observations from changes in pool operation.

ENGINEERING INPUT / SELECTION CRITERIA

A specification is only the starting point.

A useful configuration connects product ratings to the actual operating environment.

Assessment areaSite informationEngineering decision
Pipework & connectivityOutside / nominal diameter, material, branches and closed electrical loopsModel fit, clearance and signal conditions
Hydraulic conditionsFlow, circulation path, pump position and available pressureInstallation location and filtration configuration
Water & processHardness, suspended solids, temperature and existing treatmentTreatment roles and processes to retain
Operation & maintenanceLoad profile, cleaning history, inspection and discharge accessComparable baseline and practical service access

Electronic scale control, particle separation and water-quality compliance are separate responsibilities. A site may need several coordinated processes. Neither scale control nor filtration universally replaces softening, membrane treatment, disinfection or chemical management.

Related applications

ENGINEERING STARTS WITH CONTEXT

Tell us about your water system.

Pipework, operating conditions and your objectives. Let’s start there.

Discuss your system
QEQI Q49 | QEQI